Dai, H, Cao, G and Su, H (2006) Management and Construction of the Three Gorges Project. Journal of Construction Engineering and Management, 132(06), 615–9.

Dzeng, R (2006) Identifying a Design Management Package to Support Concurrent Design in Building Wafer Fabrication Facilities. Journal of Construction Engineering and Management, 132(06), 606–14.

Ezeldin, A S and Sharara, L M (2006) Neural Networks for Estimating the Productivity of Concreting Activities. Journal of Construction Engineering and Management, 132(06), 650–6.

  • Type: Journal Article
  • Keywords: Neural network; Concrete; Productivity; Computer application; Developing countries; Project management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:6(650)
  • Abstract:
    To overcome the variability and the impact of subjective factors on the cost of concrete-related activities in developing countries, neural networks can offer a guiding tool. In this study, three neural networks were developed to estimate the productivity, within a developing market, for formwork assembly, steel fixing, and concrete pouring activities. Eighteen experts working in six projects were carefully selected to gather the data for the neural networks. Ninety-two data surveys were obtained and processed for use by the neural networks. Commercial software was used to perform the neural network calculations. The processed data were used to develop, train, and test the neural networks. The results of the developed framework of neural networks indicate adequate convergence and relatively strong generalization capabilities. When used to perform a sensitivity analysis on the input factors influencing the productivity of concreting activities, the framework has demonstrated a good potential in identifying trends of such factors.

Fang, D, Chen, Y and Wong, L (2006) Safety Climate in Construction Industry: A Case Study in Hong Kong. Journal of Construction Engineering and Management, 132(06), 573–84.

Hegab, M, Smith, G R and Salem, O M (2006) Soil Penetration Modeling in Microtunneling Projects. Journal of Construction Engineering and Management, 132(06), 598–605.

Huang, R and Sun, K (2006) Non-Unit-Based Planning and Scheduling of Repetitive Construction Projects. Journal of Construction Engineering and Management, 132(06), 585–97.

Khalafallah, A and El-Rayes, K (2006) Minimizing Construction-Related Hazards in Airport Expansion Projects. Journal of Construction Engineering and Management, 132(06), 562–72.

Lo, T Y, Fung, I W and Tung, K C (2006) Construction Delays in Hong Kong Civil Engineering Projects. Journal of Construction Engineering and Management, 132(06), 636–49.

Nassar, K M and Hegab, M Y (2006) Developing a Complexity Measure for Project Schedules. Journal of Construction Engineering and Management, 132(06), 554–61.

Yi, K and Langford, D (2006) Scheduling-Based Risk Estimation and Safety Planning for Construction Projects. Journal of Construction Engineering and Management, 132(06), 626–35.

Zhao, T and Fu, C C (2006) Infrastructure Development and Expansion under Uncertainty: A Risk-Preference-Based Lattice Approach. Journal of Construction Engineering and Management, 132(06), 620–5.